Waterproof Working Trolley
Category:
Tags:
- Product Description
- Parameter
- Video
Waterproof Working Trolley
-
- Commodity name: Waterproof Working Trolley
To address the issues of low intelligence and high labor intensity in tunnel waterproofing and rebar work, Luoyang China Railway Qiangli Machinery Co., Ltd. has independently developed a new intelligent integrated machine for waterproofing and rebar operations.
Product Introduction
To address the issues of low intelligence and high labor intensity in tunnel waterproofing and rebar work, Luoyang China Railway Qiangli Machinery Co., Ltd. has independently developed a new intelligent integrated machine for waterproofing and rebar operations.
This vehicle mainly consists of a gantry frame, an arc-shaped track, a laying and hanging trolley, a traveling system, a hydraulic system, and an intelligent control system.
The waterproof rebar working integrated machine produced by China Railway Qiangli adopts a gantry frame structure, ensuring sufficient clearance for vehicle passage and reserving space for ventilation pipes—thus eliminating interference with construction that is common in similar products. The curved track features an integral welded design, offering stable structural performance and high load-bearing capacity. The laying trolley is equipped with a spring-rod leveling device that presses the waterproof membrane tightly against the excavation surface, completely replacing manual labor, reducing worker fatigue, and improving both the quality and efficiency of laying operations. This trolley uses tire-mounted electric propulsion, eliminating the need for manual track laying and allowing for flexible relocation. Equipped with lateral shifting mechanisms at both ends of the gantry, the machine can smoothly navigate turns within the tunnel, effectively preventing deviations during the laying process. The top-step ladder combined with a double-layer side platform design enables the sliding platform to extend up to 1 meter, completely eliminating construction blind spots and meeting the requirements of various cross-sections.
This device has three major advantages compared to products from other manufacturers.
1. Mechatronic and hydraulic integration design. Utilizing intelligent control technology, all operations can be remotely controlled wirelessly, making operation even simpler for workers.
2. Smooth operation, safe and reliable. The arc-shaped track features an all-welded design and is driven by a chain-powered trolley. Compared to wire-rope-driven systems available on the market, this design offers smoother and more efficient performance in waterproof operations, while also providing enhanced safety, durability, and easier maintenance.
3. One machine with multiple functions to meet customized needs. In addition to laying geotextiles and waterproof boards, the machine can be equipped with auxiliary fixtures to automatically drag reinforcing bars in a circular manner, saving 2–3 operators. The gantry frame is fitted with lifting systems on both sides for hoisting waterproof boards and reinforcing bars, and an auxiliary support structure is installed at the top to enable detection of over- or under-excavation. For open-cut tunnels, we have also developed an integrated fabric-hanging and curing machine to meet customers’ customized requirements.
Compared with other similar products, using the China Railway Qiangli waterproof rebar working integrated machine can effectively reduce labor input by 15% and increase efficiency by more than 10%. It has now been widely adopted in numerous high-speed rail and highway construction projects and has earned unanimous praise from construction companies.
-
Input voltage 380V/50Hz Walking speed 5m/min Walking power 3.0Kw Translation distance ±100mm Laying speed 2.8-3m/min Platform adjustable length 1 m Waterproof board smoothing device 10 pieces Single waterproof board length 6 m (maximum) Total length of the trolley 6-12 meters -
Waterproof Working Trolley
Product
Introduction
Contact
We
Details
Product Introduction
To address the issues of low intelligence and high labor intensity in tunnel waterproofing and rebar work, Luoyang China Railway Qiangli Machinery Co., Ltd. has independently developed a new intelligent integrated machine for waterproofing and rebar operations.
This vehicle mainly consists of a gantry frame, an arc-shaped track, a laying and hanging trolley, a traveling system, a hydraulic system, and an intelligent control system.
The waterproof rebar working integrated machine produced by China Railway Qiangli adopts a gantry frame structure, ensuring sufficient clearance for vehicle passage and reserving space for ventilation pipes—thus eliminating interference with construction that is common in similar products. The curved track features an integral welded design, offering stable structural performance and high load-bearing capacity. The laying trolley is equipped with a spring-rod leveling device that presses the waterproof membrane tightly against the excavation surface, completely replacing manual labor, reducing worker fatigue, and improving both the quality and efficiency of laying operations. This trolley uses tire-mounted electric propulsion, eliminating the need for manual track laying and allowing for flexible relocation. Equipped with lateral shifting mechanisms at both ends of the gantry, the machine can smoothly navigate turns within the tunnel, effectively preventing deviations during the laying process. The top-step ladder combined with a double-layer side platform design enables the sliding platform to extend up to 1 meter, completely eliminating construction blind spots and meeting the requirements of various cross-sections.
This device has three major advantages compared to products from other manufacturers.
1. Mechatronic and hydraulic integration design. Utilizing intelligent control technology, all operations can be remotely controlled wirelessly, making operation even simpler for workers.
2. Smooth operation, safe and reliable. The arc-shaped track features an all-welded design and is driven by a chain-powered trolley. Compared to wire-rope-driven systems available on the market, this design offers smoother and more efficient performance in waterproof operations, while also providing enhanced safety, durability, and easier maintenance.
3. One machine with multiple functions to meet customized needs. In addition to laying geotextiles and waterproof boards, the machine can be equipped with auxiliary fixtures to automatically drag reinforcing bars in a circular manner, saving 2–3 operators. The gantry frame is fitted with lifting systems on both sides for hoisting waterproof boards and reinforcing bars, and an auxiliary support structure is installed at the top to enable detection of over- or under-excavation. For open-cut tunnels, we have also developed an integrated fabric-hanging and curing machine to meet customers’ customized requirements.
Compared with other similar products, using the China Railway Qiangli waterproof rebar working integrated machine can effectively reduce labor input by 15% and increase efficiency by more than 10%. It has now been widely adopted in numerous high-speed rail and highway construction projects and has earned unanimous praise from construction companies.
Parameter
| Input voltage | 380V/50Hz |
| Walking speed | 5m/min |
| Walking power | 3.0Kw |
| Translation distance | ±100mm |
| Laying speed | 2.8-3m/min |
| Platform adjustable length | 1 m |
| Waterproof board smoothing device | 10 pieces |
| Single waterproof board length | 6 m (maximum) |
| Total length of the trolley | 6-12 meters |
Video
- Product Description
- Parameter
- Video
Waterproof Working Trolley
-
- Commodity name: Waterproof Working Trolley
To address the issues of low intelligence and high labor intensity in tunnel waterproofing and rebar work, Luoyang China Railway Qiangli Machinery Co., Ltd. has independently developed a new intelligent integrated machine for waterproofing and rebar operations.
Product Introduction
To address the issues of low intelligence and high labor intensity in tunnel waterproofing and rebar work, Luoyang China Railway Qiangli Machinery Co., Ltd. has independently developed a new intelligent integrated machine for waterproofing and rebar operations.
This vehicle mainly consists of a gantry frame, an arc-shaped track, a laying and hanging trolley, a traveling system, a hydraulic system, and an intelligent control system.
The waterproof rebar working integrated machine produced by China Railway Qiangli adopts a gantry frame structure, ensuring sufficient clearance for vehicle passage and reserving space for ventilation pipes—thus eliminating interference with construction that is common in similar products. The curved track features an integral welded design, offering stable structural performance and high load-bearing capacity. The laying trolley is equipped with a spring-rod leveling device that presses the waterproof membrane tightly against the excavation surface, completely replacing manual labor, reducing worker fatigue, and improving both the quality and efficiency of laying operations. This trolley uses tire-mounted electric propulsion, eliminating the need for manual track laying and allowing for flexible relocation. Equipped with lateral shifting mechanisms at both ends of the gantry, the machine can smoothly navigate turns within the tunnel, effectively preventing deviations during the laying process. The top-step ladder combined with a double-layer side platform design enables the sliding platform to extend up to 1 meter, completely eliminating construction blind spots and meeting the requirements of various cross-sections.
This device has three major advantages compared to products from other manufacturers.
1. Mechatronic and hydraulic integration design. Utilizing intelligent control technology, all operations can be remotely controlled wirelessly, making operation even simpler for workers.
2. Smooth operation, safe and reliable. The arc-shaped track features an all-welded design and is driven by a chain-powered trolley. Compared to wire-rope-driven systems available on the market, this design offers smoother and more efficient performance in waterproof operations, while also providing enhanced safety, durability, and easier maintenance.
3. One machine with multiple functions to meet customized needs. In addition to laying geotextiles and waterproof boards, the machine can be equipped with auxiliary fixtures to automatically drag reinforcing bars in a circular manner, saving 2–3 operators. The gantry frame is fitted with lifting systems on both sides for hoisting waterproof boards and reinforcing bars, and an auxiliary support structure is installed at the top to enable detection of over- or under-excavation. For open-cut tunnels, we have also developed an integrated fabric-hanging and curing machine to meet customers’ customized requirements.
Compared with other similar products, using the China Railway Qiangli waterproof rebar working integrated machine can effectively reduce labor input by 15% and increase efficiency by more than 10%. It has now been widely adopted in numerous high-speed rail and highway construction projects and has earned unanimous praise from construction companies.
-
Input voltage 380V/50Hz Walking speed 5m/min Walking power 3.0Kw Translation distance ±100mm Laying speed 2.8-3m/min Platform adjustable length 1 m Waterproof board smoothing device 10 pieces Single waterproof board length 6 m (maximum) Total length of the trolley 6-12 meters -
Related products
Get a free product quote
Please provide your phone number and email address, and we will contact you promptly within one business day to resolve your issue as soon as possible.
Want more details of product, please leave your message.
Luoyang China Railway Qiangli Machinery Co., Ltd
Phone:+86-379-67851100
Email:897020395@qq.com
Address: Luoyang City, Henan Province, Circular Economy Park
Video Account
TikTok