QGM312A Arch Frame Installation and Drilling Rig Machine
Tags:
- Product Description
- Parameter
- Video
QGM312A Arch Frame Installation and Drilling Rig Machine
-
- Commodity name: QGM312A Arch Frame Installation and Drilling Rig Machine
Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.
Product Introduction
Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.
Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;
Three major processes: scaffolding, anchor rods, and grouting;
Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.
Structural features
Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.
Significant advantage
1. Green: low energy consumption, zero emissions;
2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.
3. Smart: Remote control and automatic data collection and upload;
4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.
-
Serial number
Project
Parameter
Note
1
Weight
33t
2
External dimensions (length × width × height)
10,300 × 3,250 × 3,300 mm
3
Engine power
155kw/2200rpm
4
Maximum vehicle speed
23.5km/h
5
Approaching the departure angle
22°
6
Motor power
2 × 55 kW
7
Maximum system pressure
28Mpa
8
Scope of work
22,000 × 13,000 mm
9
Side arm rotation angle
-20 to 90°
10
Middle arm rotation angle
-45 to -45°
11
Maximum lifting capacity of the main boom
3t
12
Maximum lifting force of the side arm
2t
13
Gondola dimensions
800×800mm
14
Hanging basket unfolded dimensions
800×2040mm
15
Rock drill model
PD380
Rock drilling system
16
Rock drill power
2 × 18 kW
17
Drill hole diameter
41-110mm
18
Pump power
11kw
Waterway system
19
Maximum pressure
20bar
20
Maximum flow
16 m³/h
21
Air compressor power
8kw
Air circuit system
22
Maximum wind pressure
8bar
23
Maximum airflow
1 m³/min
24
Breaker model
JSB300
Breaker
25
Impact frequency
600-1100
26
Work pressure
10-15Mpa
27
Maximum grouting capacity
4 m³/h
Grouting System
-
QGM312A Arch Frame Installation and Drilling Rig Machine
Product
Introduction
Contact
We
Details
Product Introduction
Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.
Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;
Three major processes: scaffolding, anchor rods, and grouting;
Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.
Structural features
Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.
Significant advantage
1. Green: low energy consumption, zero emissions;
2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.
3. Smart: Remote control and automatic data collection and upload;
4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.
Parameter
Serial number | Project | Parameter | Note |
1 | Weight | 33t |
|
2 | External dimensions (length × width × height) | 10,300 × 3,250 × 3,300 mm |
|
3 | Engine power | 155kw/2200rpm |
|
4 | Maximum vehicle speed | 23.5km/h |
|
5 | Approaching the departure angle | 22° |
|
6 | Motor power | 2 × 55 kW |
|
7 | Maximum system pressure | 28Mpa |
|
8 | Scope of work | 22,000 × 13,000 mm |
|
9 | Side arm rotation angle | -20 to 90° |
|
10 | Middle arm rotation angle | -45 to -45° |
|
11 | Maximum lifting capacity of the main boom | 3t |
|
12 | Maximum lifting force of the side arm | 2t |
|
13 | Gondola dimensions | 800×800mm |
|
14 | Hanging basket unfolded dimensions | 800×2040mm |
|
15 | Rock drill model | PD380 | Rock drilling system |
16 | Rock drill power | 2 × 18 kW | |
17 | Drill hole diameter | 41-110mm | |
18 | Pump power | 11kw | Waterway system |
19 | Maximum pressure | 20bar | |
20 | Maximum flow | 16 m³/h | |
21 | Air compressor power | 8kw | Air circuit system |
22 | Maximum wind pressure | 8bar | |
23 | Maximum airflow | 1 m³/min | |
24 | Breaker model | JSB300 | Breaker |
25 | Impact frequency | 600-1100 | |
26 | Work pressure | 10-15Mpa | |
27 | Maximum grouting capacity | 4 m³/h | Grouting System |
Video
- Product Description
- Parameter
- Video
QGM312A Arch Frame Installation and Drilling Rig Machine
-
- Commodity name: QGM312A Arch Frame Installation and Drilling Rig Machine
Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.
Product Introduction
Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.
Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;
Three major processes: scaffolding, anchor rods, and grouting;
Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.
Structural features
Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.
Significant advantage
1. Green: low energy consumption, zero emissions;
2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.
3. Smart: Remote control and automatic data collection and upload;
4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.
-
Serial number
Project
Parameter
Note
1
Weight
33t
2
External dimensions (length × width × height)
10,300 × 3,250 × 3,300 mm
3
Engine power
155kw/2200rpm
4
Maximum vehicle speed
23.5km/h
5
Approaching the departure angle
22°
6
Motor power
2 × 55 kW
7
Maximum system pressure
28Mpa
8
Scope of work
22,000 × 13,000 mm
9
Side arm rotation angle
-20 to 90°
10
Middle arm rotation angle
-45 to -45°
11
Maximum lifting capacity of the main boom
3t
12
Maximum lifting force of the side arm
2t
13
Gondola dimensions
800×800mm
14
Hanging basket unfolded dimensions
800×2040mm
15
Rock drill model
PD380
Rock drilling system
16
Rock drill power
2 × 18 kW
17
Drill hole diameter
41-110mm
18
Pump power
11kw
Waterway system
19
Maximum pressure
20bar
20
Maximum flow
16 m³/h
21
Air compressor power
8kw
Air circuit system
22
Maximum wind pressure
8bar
23
Maximum airflow
1 m³/min
24
Breaker model
JSB300
Breaker
25
Impact frequency
600-1100
26
Work pressure
10-15Mpa
27
Maximum grouting capacity
4 m³/h
Grouting System
-
Related products
Get a free product quote
Please provide your phone number and email address, and we will contact you promptly within one business day to resolve your issue as soon as possible.
Want more details of product, please leave your message.
Luoyang China Railway Qiangli Machinery Co., Ltd
Phone:+86-379-67851100
Email:897020395@qq.com
Address: Luoyang City, Henan Province, Circular Economy Park
Video Account
TikTok