• QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
+

QGM312A Arch Frame Installation and Drilling Rig Machine

Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

Product inquiry phone:

    QGM312A Arch Frame Installation and Drilling Rig Machine

    • Product Description
    • Parameter
    • Video
    • Commodity name: QGM312A Arch Frame Installation and Drilling Rig Machine

    Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

    Product Introduction

      Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

      Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;

      Three major processes: scaffolding, anchor rods, and grouting;

      Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.

    Structural features

      Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.

    Significant advantage

      1. Green: low energy consumption, zero emissions;

      2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.

      3. Smart: Remote control and automatic data collection and upload;

      4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.

  • Serial number

    Project

    Parameter

    Note

    1

    Weight

    33t

     

    2

    External dimensions (length × width × height)

    10,300 × 3,250 × 3,300 mm

     

    3

    Engine power

    155kw/2200rpm

     

    4

    Maximum vehicle speed

    23.5km/h

     

    5

    Approaching the departure angle

    22°

     

    6

    Motor power

    2 × 55 kW

     

    7

    Maximum system pressure

    28Mpa

     

    8

    Scope of work

    22,000 × 13,000 mm

     

    9

    Side arm rotation angle

    -20 to 90°

     

    10

    Middle arm rotation angle

    -45 to -45°

     

    11

    Maximum lifting capacity of the main boom

    3t

     

    12

    Maximum lifting force of the side arm

    2t

     

    13

    Gondola dimensions

    800×800mm

     

    14

    Hanging basket unfolded dimensions

    800×2040mm

     

    15

    Rock drill model

    PD380

    Rock drilling system

    16

    Rock drill power

    2 × 18 kW

    17

    Drill hole diameter

    41-110mm

    18

    Pump power

    11kw

    Waterway system

    19

    Maximum pressure

    20bar

    20

    Maximum flow

    16 m³/h

    21

    Air compressor power

    8kw

    Air circuit system

    22

    Maximum wind pressure

    8bar

    23

    Maximum airflow

    1 m³/min

    24

    Breaker model

    JSB300

    Breaker

    25

    Impact frequency

    600-1100

    26

    Work pressure

    10-15Mpa

    27

    Maximum grouting capacity

    4 m³/h

    Grouting System

QGM312A Arch Frame Installation and Drilling Rig Machine

Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

Product

Introduction

Contact

We

QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
QGM312A Arch Frame Installation and Drilling Rig Machine
+
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine
  • QGM312A Arch Frame Installation and Drilling Rig Machine

Details


Product Introduction

  Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

  Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;

  Three major processes: scaffolding, anchor rods, and grouting;

  Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.

Structural features

  Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.

Significant advantage

  1. Green: low energy consumption, zero emissions;

  2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.

  3. Smart: Remote control and automatic data collection and upload;

  4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.

Parameter


Serial number

Project

Parameter

Note

1

Weight

33t

 

2

External dimensions (length × width × height)

10,300 × 3,250 × 3,300 mm

 

3

Engine power

155kw/2200rpm

 

4

Maximum vehicle speed

23.5km/h

 

5

Approaching the departure angle

22°

 

6

Motor power

2 × 55 kW

 

7

Maximum system pressure

28Mpa

 

8

Scope of work

22,000 × 13,000 mm

 

9

Side arm rotation angle

-20 to 90°

 

10

Middle arm rotation angle

-45 to -45°

 

11

Maximum lifting capacity of the main boom

3t

 

12

Maximum lifting force of the side arm

2t

 

13

Gondola dimensions

800×800mm

 

14

Hanging basket unfolded dimensions

800×2040mm

 

15

Rock drill model

PD380

Rock drilling system

16

Rock drill power

2 × 18 kW

17

Drill hole diameter

41-110mm

18

Pump power

11kw

Waterway system

19

Maximum pressure

20bar

20

Maximum flow

16 m³/h

21

Air compressor power

8kw

Air circuit system

22

Maximum wind pressure

8bar

23

Maximum airflow

1 m³/min

24

Breaker model

JSB300

Breaker

25

Impact frequency

600-1100

26

Work pressure

10-15Mpa

27

Maximum grouting capacity

4 m³/h

Grouting System

Video


    QGM312A Arch Frame Installation and Drilling Rig Machine

    • Product Description
    • Parameter
    • Video
    • Commodity name: QGM312A Arch Frame Installation and Drilling Rig Machine

    Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in a synchronized manner. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

    Product Introduction

      Our company has independently developed a new type of arch frame installation and drilling rig machine, which features simultaneous functions of arch erection, anchor bolt drilling, and grouting. Without needing to leave the site, this equipment can complete the three processes—arch erection, anchor bolt installation, and grouting—in one go. As a result, work efficiency is improved by more than 50% compared to conventional methods, the number of construction workers required is significantly reduced, and the safety index is markedly enhanced.

      Applicable scope: Suitable for various working methods including three-step, two-step, micro-step, and full-face operations;

      Three major processes: scaffolding, anchor rods, and grouting;

      Nine key functions: under-excavation treatment, charging, support installation, anchor mesh welding, foot-anchoring bolts, system anchors, advanced pipe sheds/casings, high-pressure grouting, and prestress application.

    Structural features

      Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered construction, diesel-powered emergency operation—each of the three arms features a rotating, foldable, and telescopic structure. The working radius of the dual-side arms is significantly greater than that of other products. The three-arm, three-gripper configuration is equipped with a high-power rock-drilling system featuring dual anchor rods, enabling a maximum drilling depth of 4.1 meters and supporting the installation of 4.5-meter drill rods. The maximum lifting capacity per arm is 3 tons, and the grouting capacity can reach up to 4 cubic meters per hour.

    Significant advantage

      1. Green: low energy consumption, zero emissions;

      2. High Efficiency: The system requires only two operators and one auxiliary worker per machine. During construction, vehicles do not need to be moved, saving 2 hours per cycle in setup and transition time. Setting up the arch takes just 50 minutes. The left and right drilling rigs can simultaneously perform operations for foot-anchoring bolts and systematic anchor bolt holes. A high-power hydraulic rock drill is employed, with a maximum power of 2 × 18 kW and a drilling speed of 2 m/min. A large-capacity grouting pump delivers 4 m³/h, with dual-grouting lines, doubling the efficiency. Additionally, the arch-support arm is equipped with dual breakers for handling under-excavation and hazard removal.

      3. Smart: Remote control and automatic data collection and upload;

      4. Safety: When drilling arch supports and anchor bolt holes, a prefabricated steel mesh is installed above to provide protection, reducing the number of workers on the working face by approximately 70%.

  • Serial number

    Project

    Parameter

    Note

    1

    Weight

    33t

     

    2

    External dimensions (length × width × height)

    10,300 × 3,250 × 3,300 mm

     

    3

    Engine power

    155kw/2200rpm

     

    4

    Maximum vehicle speed

    23.5km/h

     

    5

    Approaching the departure angle

    22°

     

    6

    Motor power

    2 × 55 kW

     

    7

    Maximum system pressure

    28Mpa

     

    8

    Scope of work

    22,000 × 13,000 mm

     

    9

    Side arm rotation angle

    -20 to 90°

     

    10

    Middle arm rotation angle

    -45 to -45°

     

    11

    Maximum lifting capacity of the main boom

    3t

     

    12

    Maximum lifting force of the side arm

    2t

     

    13

    Gondola dimensions

    800×800mm

     

    14

    Hanging basket unfolded dimensions

    800×2040mm

     

    15

    Rock drill model

    PD380

    Rock drilling system

    16

    Rock drill power

    2 × 18 kW

    17

    Drill hole diameter

    41-110mm

    18

    Pump power

    11kw

    Waterway system

    19

    Maximum pressure

    20bar

    20

    Maximum flow

    16 m³/h

    21

    Air compressor power

    8kw

    Air circuit system

    22

    Maximum wind pressure

    8bar

    23

    Maximum airflow

    1 m³/min

    24

    Breaker model

    JSB300

    Breaker

    25

    Impact frequency

    600-1100

    26

    Work pressure

    10-15Mpa

    27

    Maximum grouting capacity

    4 m³/h

    Grouting System

Related products


Get a free product quote

Please provide your phone number and email address, and we will contact you promptly within one business day to resolve your issue as soon as possible.

Sorry,当前栏目暂无内容!

您可以查看其他栏目或返回 首页

Sorry,The current column has no content!

You can view other columns or return Home

Want more details of product, please leave your message.

%{tishi_zhanwei}%

Luoyang China Railway Qiangli Machinery Co., Ltd

Phone:+86-379-67851100

Email:897020395@qq.com

Address: Luoyang City, Henan Province, Circular Economy Park